Site survey & load assessment
We check available electrical capacity, distribution boards, cable routes and parking layout, then recommend the right number and type of chargers for the site.
DEWA Approved Contractor · Dubai
HILM EV is a DEWA Approved Contractor delivering EV chargers end to end: DEWA NOC, LV design approval, load increase, installation, commissioning and DEWA meter installation, for homes, buildings, businesses and fleets across Dubai.
About us
HILM EV is the EV charging division of HILM Alibtikar Technical Services L.L.C, a Dubai-based technical services company. We look after the physical side of electric vehicle charging: getting chargers safely installed, properly tested and commissioned, and kept in working order. As a DEWA Approved Contractor, we also handle every DEWA approval your charger needs.
As more drivers in the UAE switch to electric vehicles, homes, buildings and businesses need charging that is safe, reliable and connected. We work with property owners, facility managers, fleet operators and charge point operators to plan, install and maintain charging that works from day one.
Every job is planned and tested by qualified electrical engineers, with protection and earthing verified before any charger is energised.
We design installations with maintenance in mind, so chargers are easy to service and quick to bring back if something goes wrong.
Drawings, test results and commissioning reports for every site, so owners, facility managers and insurers know exactly what is installed.
DEWA approvals, handled for you
From the DEWA NOC to the DEWA meter, we manage the full approval process and the installation, so you deal with one team instead of several.
We apply for and obtain the DEWA No Objection Certificate (NOC) for your EV charger.
Our engineers prepare the LV design and single line diagram (SLD) for the charger installation.
We submit the LV design to DEWA and follow it through to approval.
If DEWA's load study shows more capacity is needed, we apply for the load increase on your behalf.
We install the charger, cabling and protection devices, and carry out all electrical tests.
We arrange the DEWA meter installation, then commission your charger and hand over a fully documented, working system.
One contractor for your EV charger, from DEWA NOC to switch-on.
Start your DEWA applicationServices
One team for the full life of your charging equipment, so nothing falls between the installer and the maintainer.
We check available electrical capacity, distribution boards, cable routes and parking layout, then recommend the right number and type of chargers for the site.
Installation of wall-mounted and pedestal AC chargers and DC fast chargers, including cabling, containment, protection devices, foundations, bollards and signage.
Insulation resistance, earthing and RCD tests, live charging tests with a vehicle or load bank, OCPP and network configuration, and a documented handover.
Scheduled inspections under annual maintenance contracts: cleaning, connector and cable checks, thermal checks, firmware updates and a report after every visit.
Fault diagnosis on site and remotely, replacement of faulty parts, and coordination with manufacturers on warranty claims to get chargers back in service.
Supply of EV chargers, cables, connectors and spare parts matched to your site, power availability and the way your chargers will be used.
Chargers we work with
We work across manufacturers and charger types. During the site survey we confirm which equipment suits your power supply, parking and how quickly vehicles need to charge.
The everyday choice for villas, residential buildings, offices and hotels where cars are parked for a few hours or overnight.
For locations where drivers stop for a short time, such as malls, hotels, service stations and commercial car parks.
Multi-bay, high-power installations for taxi, delivery and corporate fleets, and for public charging hubs.
Already have chargers installed by another company? We can inspect them and take over their maintenance.
Who we work with
Wallbox installation for private parking.
Shared charging for owners' associations and communities.
Offices, malls and hotels adding charging for staff and visitors.
Taxi, delivery and corporate fleets charging at scale.
Installation and field maintenance for public networks.
How we work
A survey tells us what your electrical supply can support before any equipment is chosen, so there are no surprises later.
DEWA NOC, LV design, single line diagram, DEWA LV design approval, load increase and DEWA meter installation, all managed by our team.
We set up OCPP and network connections so chargers report to your charge point management system from the first day.
So you, your facility manager and your insurer know exactly what was installed.
FAQ
Yes. Dubai Electricity and Water Authority (DEWA) approval is required before installing, operating or maintaining EV charging stations in Dubai. As a DEWA Approved Contractor, we handle it for you: we obtain the DEWA NOC, prepare the LV design and single line diagram, get DEWA LV design approval, apply for a load increase if DEWA's study requires one, and arrange DEWA meter installation.
Not always. DEWA studies the existing load at your premises. If the charger needs more capacity than is available, we apply for the load increase and manage it through to approval.
Yes. We start with a full inspection and test of the existing installation, report anything that needs fixing, and then take over routine maintenance.
We work with AC and DC chargers from a range of manufacturers, including OCPP-compatible chargers that connect to charge point management systems. If you already have a charger in mind, tell us and we'll confirm it suits your site.
It depends on the site, the available power and the approvals needed. After the site survey we give you a clear schedule covering approvals, installation and commissioning.
An annual maintenance contract (AMC) covers scheduled preventive maintenance visits and agreed support when a charger develops a fault. The scope is tailored to the number and type of chargers and how critical they are to your operation.
Yes. A survey lets us check the electrical supply, cable routes and parking layout so the quotation reflects the actual work required.
Contact
Planning new chargers or need help with existing ones? Send us a few details and our team will get back to you.